Hawkins-Weir engineers reviewing plans at a wastewater treatment site
Our Work

Engineering that serves the people who depend on it.

Every project starts with something that matters to someone — and we stay with it until it’s solved.

Featured Work

Built around the problems that matter.

Every project starts with something important to the people we serve — a system that needs to work, an investment that needs to make sense, or a problem that can’t wait. No two communities have the same problem, so no two solutions look the same — here’s how we’ve helped move those challenges forward.

FPO photoAdams Field water reclamation facility
Little Rock
Featured 01

The permit no one else went looking for

When more capacity didn’t have to mean more construction.

The challenge

The Little Rock Water Reclamation Authority was approaching a hard capacity ceiling. The obvious answer was to build more — an expensive solution ratepayers would feel for years.

The thinking

We looked for another way. Instead of starting with a bigger facility, we pursued a permit modification based on a federal court ruling that changed what the existing plant could do.

The collaboration

LRWRA and state and federal regulators, through a review no one in Arkansas had run before.

The outcome

The result: peak capacity increased from 72 to 94 MGD, 34 million gallons of required storage was eliminated, and ratepayers saved more than $10 million before design even began.

The long-term impact

And the work established the first blending permit in Arkansas and EPA Region 6 — giving other utilities a precedent to follow.

“[ Client quote — LRWRA on the capacity win and the savings. ]”[ Name, title ] · LRWRA · placeholder
$10M+
saved before design began
See the expertise behind this →See similar Water projects →
BeforeFailing 1913 retaining wall
& downtown drainage at risk
AfterRebuilt wall —
drainage & trestle secured
Featured 02

The wall that took a handshake to fix

Sometimes the engineering problem is the easy part.

The challenge

A failing retaining wall in downtown Van Buren threatened the City’s primary drainage system and a railroad trestle dating to 1913.

The thinking

The technical fix was clear. The harder problem was getting two owners to agree on how to pay for it.

The collaboration

We stepped in as the neutral party, helped broker the agreement, and then carried the project through design and construction management.

The outcome

The result was a 50/50 cost-share that kept the railroad’s portion under $200,000 and saved each party roughly $350,000 on a $388,000 project.

The long-term impact

The drainage system was secured. The historic trestle was protected. And a difficult problem became a shared solution.

“[ Client quote — City of Van Buren or AMRR on the brokered partnership. ]”[ Name, title ] · placeholder
~$350K
saved for each party
See the expertise behind this →See similar Funding & partnership projects →
BeforeP Street WWTP after
the April 1996 F3 tornado
AfterRestored & hardened
above the 100-yr flood
Featured 03

A treatment plant, back on line after an F3

When the unexpected happens, the work still has to perform.

The challenge

In April 1996, an F3 tornado struck Fort Smith’s P Street Wastewater Treatment Plant, damaging the headworks, chlorine building, operations, laboratory and maintenance facilities. The plant still had to meet its permit.

The thinking

Our approach was to restore compliance first, then rebuild the below-grade headworks pump station while keeping critical systems in service — and incorporate relocated chlorination into the new footprint.

The collaboration

We worked alongside the City, FEMA, the insurer and subconsultants to help move the recovery forward.

The outcome

The work supported the City’s insurance claim and FEMA hazard-mitigation application, helping raise structures above the 100-year flood level. It ultimately earned an ACEC Engineering Excellence Award.

The long-term impact

The result wasn’t simply a restored plant. It was a plant better prepared for what could come next.

“[ Client quote — City of Fort Smith on the recovery. ]”[ Name, title ] · placeholder
ACEC award
Engineering Excellence
See the expertise behind this →See similar Resilience & recovery projects →
FPO photoRegionalized water system
Delta communities
Featured 04

Four communities, off the failure list

Sometimes the right answer is bigger than one community.

The challenge

Four Delta communities were living with yellow water and failing equipment — and sitting on the state’s failure list without a clear path forward on their own.

The thinking

Rather than treating the communities as four separate problems, we studied the opportunity to regionalize their systems.

The collaboration

Working with the communities and the Arkansas Natural Resources Commission, we helped chart a shared path forward and support the funding effort.

The outcome

The result: roughly $12 million unlocked, the communities off the failure list, and clean water reaching more than 500 connections. Construction was completed in 2025.

The long-term impact

The regional system gives those communities something more important than a short-term fix: infrastructure built to serve families for decades.

“[ Client quote — ANRC or a member community. ]”[ Name, title ] · placeholder
~$12M
unlocked · 500+ connections
See the expertise behind this →See similar Failing-infrastructure projects →
FPO photoBoundary survey & parcel mapping
Fort Smith Regional Airport
Featured 05

The record that protects the runway

Sometimes protecting what comes next starts with getting the record right.

The challenge

To maintain its FAA funding, Fort Smith Regional Airport needed an airtight boundary survey and ownership record for every parcel tied to the airport — decades of acquisitions, easements and tangled property records.

The thinking

We approached it as more than a survey. We rebuilt the ownership story tract by tract.

The collaboration

The airport, Delta Airport Consultants, and the Sebastian County Tax Assessor.

The outcome

We documented 35 tracts down to acquisition date, funding source and federal project number, compiled easements, established the perimeter with permanent monuments, and reconciled tax-exemption status.

The long-term impact

The result is a defensible property record that protects federal funding and gives the airport a stronger foundation for whatever comes next.

“[ Client quote — Fort Smith Regional Airport. ]”[ Name, title ] · placeholder
35 tracts
documented & monumented
See the expertise behind this →See similar Survey & GIS projects →
The full library

Find the work by the problem it solved.

Not every project needs a long story. But every project tells us something about the problems our clients trust us to handle.

By challenge
By discipline
FPO
Growth & capacityWater
LRWRA · Little Rock
Adams Field

A capacity ceiling that would’ve cost ratepayers for a generation — solved with a permit, not a build.

$10M+ saved before design
Read the story →
FPO
Failing infrastructureStructural
Arkansas & Missouri Railroad · Van Buren
AMRR Wall & Drainage

A 1913 trestle and downtown drainage, one failing wall away from trouble — fixed with a brokered deal.

~$350K saved each side
Read the story →
FPO
Resilience & recoveryWastewater
City of Fort Smith · Fort Smith
P Street WWTP

A treatment plant flattened by an F3 tornado that still had to meet its permit.

ACEC Engineering Excellence Award
Read the story →
FPO
Failing infrastructureWater
ANRC · Delta region
Wright-Pastoria

Four communities on the state’s failure list, out of options alone — regionalized into one system.

~$12M · 500+ connections
Read the story →
FPO
Ground truthSurvey
Fort Smith Regional Airport · Fort Smith
Airport Survey & Mapping

FAA funding riding on an airtight ownership record across decades of acquisitions.

35 tracts documented
Read the story →
FPO
Failing infrastructureTransportation
Arkansas National Guard · Fort Chaffee
CMTC Bridge 019

A rotting timber bridge on a National Guard training route, replaced before it failed.

New 62-ft concrete span
See similar →
FPO
Growth & capacityWater
City of Fayetteville · Fayetteville
Benson Mountain Tank & Pump Station

Growth outran the Benson pressure plane; an aging standpipe was failing.

100,000-gal elevated tank
See similar →
FPO
Planning & studiesWater
Beaver Water District · NW Arkansas
Residuals Disposal Study

One of Arkansas’s largest water providers needed a 20-year plan for its treatment residuals.

20-yr plan · ~11,000 tons/yr
See similar →
FPO
Growth & capacitySurvey
Fort Smith School District · Fort Smith
Morrison Elementary

A growing district needed room for 350 more students, from the ground up.

Full campus survey + site design
See similar →
FPO
Resilience & recoveryWastewater
City of Fort Smith · Fort Smith
Sunnymede Wet-Weather Facility

A storm-surge plant that had to run itself when staff were stretched thinnest.

Single-operator automation
See similar →

No projects match that combination yet — try another filter.

Bring us the problem

You don’t have to have the answer before you call us.

Maybe you know exactly what needs to be built.
Maybe you just know something isn’t working.
Maybe you’re trying to figure out how to fund it, where to start, or what your options are.

Bring us the problem.

We’ll bring the people who know how to work through it.